Luckily, the railroad suffered no damage from Hurricane Lee other than a few trees down across the tracks. Clean up was speedy, allowing restoration work and shop tours to resume last weekend. Paul and Bob spent Saturday in the shop working to make the lower panels for the new front cab wall. Rivet holes were drilled and fit up bolts installed. This allowed the panels to be trimmed to their final size and shape using the plasma cutter. Next, these new panels will be riveted!