9/25/2022 Work Session

A small but mighty volunteer crew of two worked this Saturday, enjoying the beautiful, breezy early fall day. Paul VS single handily lugged the third batch of boiler tubes out to the storage rack. The boiler is nearly empty of flues and the pile is getting big!

Paul and Bob then set up the new front cab wall sheet so that the outline of the boiler could be laid out and cut with a plasma cutter. The cut went well using a jig to guide the arced path of the torch. They reduced the diameter by one inch to allow margin of error for final fitment.

Present: Paul VS, Bob